Our Mentors
All our employees work in coordination with each
other to ensure that all the undertaken projects are completed by us
within predetermined time period. Guided by our following mentors, the
workers of our company enable themselves to fulfill customers' demands:
Name
|
Designation
|
Mr. L.C. Tolani
|
CMD
|
Mr Prashant Muley
|
General Manager - Marketing (unit II - Solvent Extraction Plant)
|
Mr Jay Kumar
|
Marketing Manager
|
Our Infrastructure
The use of
technologically advance tools and state-of-the-art technology has become
essential in every business. And, for this reason, we have employed
technologically advance resources to ensure that our production process
in conducted without any hassle. It is because of our infrastructural
facility that we are able to meet our customers' demands. Being set up
on a large piece of land, our base is divided into different units and
departments.
Testing Facilities
Following tests are performed:
- Engineering analysis to hydraulic transient in waterways and power system for ensuring product reliability
- Pumps and turbines are tested to ensure the performance and warranted characteristics.
Quality For Us
Being a quality focused company,
we only believe in rendering quality products to our customers. From
material procurement to designing and manufacturing, we are the
considered to be the best when it comes to the buying of quality assured
Coil Handling Equipment, Pipe Rotators, Drop Weight Tear Testing
Machines, etc. Prior to the delivery, our product line is checked for
the following factors:
- Durability
- Corrosion resistance
- Higher performance
- Wear & Tear resistance
- Precision engineered
Turnkey Projects
It is not the product quality
alone that has gained us immense popularity in the market, but our
strict adherence to ethical business practices has enabled us win our
customers' hearts. Moreover, in order to save time and obtain the
desired result, we even go beyond our boundaries. Customers of this
domain choose us for the undertaking the following turnkey projects:
- Construction / installation of the equipment
- Demonstration of regulatory compliance
- Operator training
- Obtaining necessary permits and approvals
- Performance testing
- Preparation of equipment specifications for the desired system
- Review and approval of the design drawings
- System start-up
- System operation & Maintenance
- Selection of the appropriate equipment
